• Facebook
  • Instagram
  • LinkedIn
  • Twitter
  • Phone: +1 (317) 923-9733
  • Email: support@getspsshelp.com
SPSS Assignment Help You Can Trust
  • Qualitative Assignment
    • STATA Assignment Help
    • SAS Assignment Help
    • MATLAB Assignment Help
    • Minitab Assignment Help
    • EPI Info Assignment Help
    • EViews Assignment Help
    • Advanced Excel Assignment Help
  • Quantitative Assignment
    • Report Writing Assignment Help
    • QDA MINER Assignment Help
    • ATLAS TI Assignment Help
    • KOBO Tool Assignment Help
  • Accounting Softwares
    • Microsoft Navision Assignment Help
    • ERP Assignment Help
    • SAP Assignment Help
    • Sage Assignment Help
    • Quickbooks Assignment Help
  • Universities
    • Capella University
    • Rasmussen University
    • Walden University
    • Liberty University
    • University of Phoenix
    • Strayer University
    • New Hampshire University
    • Morgan State University
    • Grand Canyon University
    • Chamberlain Assignments Help
    • Auburn University of Montgomery
  • Blog
  • Login
  • Get a quote
  • Menu Menu

UNIT IV PROJECT

September 18, 2025/in General Questions /by Besttutor

UNIT IV PROJECT OSH4308

Instructions

Hazardous Noises Report After receiving good remarks from your previous work, you hear that Acme Manufacturing Co. has asked you and BSCI to return for some additional work. BSCI has been contracted by Acme Manufacturing Co. to conduct a study to determine employee exposures to noise. In addition, Acme Manufacturing Co. has requested that, while on site, you conduct a needs analysis to determine the development of a new safety training program, exhibiting training and management techniques. Explain your methodology and the steps in conducting this needs analysis. After conducting a field assessment, prepare a written report for Bob Sanders (CSP) to present to the Board of Directors. During your field investigation, you find the following field observations: Machine Shop #1 The company has an on-site maintenance and repair facility. Inside Machine Shop #1, there are five employees that operate a variety of machines, ranging from stationary and portable grinders, drill presses, and metal shearers. Based on the information provided in the following table, determine the individual employee’s exposure: (DO NOT COMBINE NOISE LEVELS)

Location Employee Sample #1 Sample Time #1 Sample #2 Sample Time #2 Sample #3 Sample Time #3
Stationary Grinding Wheel Robert Jones 82 dBA 90 min 91 dBA 125 min 83 dBA 265 min
Drill Press #4 Clara Tucker 89 dBA 135 min 79 dBA 249 min 81 dBA 96 min
Metal Shear #2 Rick Starnes 75 dBA 283 min 94 dBA 39 min 84 dBA 158 min
Metal Shear #3 Jennie Gump 83 dBA 114 min 73 dBA 239 min 95 dBA 127 min
Bench Press #7 Bernie Edwards 73 dBA 203 min 79 dBA 172 min 83 dBA 105 min

Carpentry Shop #2 Inside Carpentry Shop #2, there are six machines operating almost continuously, including table saws, planers, exhaust systems, jointers, with 10 employees working in this area. To determine whether this table should be designated as a hazardous noise environment, thus requiring employees to be entered into the hearing conservation program, you must calculate combined exposures and treat the entire area as one noise source. The following table indicates the recorded measurements that you collected during your on-site assessment. Does the data from this table indicate a hazardous noise environment, and do you recommend entering employees into a hearing conservation program?

Machine Noise Level (dBA)
Table Saw #3 92 dBA
Jointer #4 87 dBA
Table Saw #5 90 dBA
Exhaust Ventilation System 80 dBA
Planer #2 84 dBA
Drill Press #1 79 dBA

Electronic Communication Repair Shop Acme Manufacturing is currently considering remodeling this shop in order to install a new noise absorbing wall and floor insulation. They have asked that you review the previous history of noise level exposures in this area and provide your recommendations. However, this data is given in measurements of N/m², but the Project Engineer is requesting the information in W/m². Given the following data, convert N/m² to W/m² and include it in your report:

Date Location SPL (N/m²)
4/12/10 East Wall 0.0683 N/m²
4/12/10 West Wall 0.0742 N/m²
4/12/10 South Wall 0.0813 N/m²
4/12/10 North Wall 0.0699 N/m²

Respond to the details in each section, and format your report in APA style. Include at least each of the following in your report for this unit:

· Introduction-briefly describe why the studies were performed (why you started the study).

· Report details-briefly discuss the details of the scenario (what you found from the study).

· Conclusions and recommendations-briefly describe your recommendations based on your findings (what you recommend to resolve any deficiencies).

· Appendix-Measurements and calculations (show your work).

· At least 4 page (double-spaced) in length (not including the reference page and appendices).

Prepare your report in a word-processing application (i.e., Word) using APA formatting for all references and in-text citations.

UNIT IV PROJECT OSH4308

 

Instructions

 

Hazardous Noises Report

 

 

 

After receiving good remarks from your previous work, you hear that Acme Manufacturing Co.

has asked you and BSCI to return for some additional work. BSCI has been contracted by Acme

Manufacturing Co. to conduct a study to determine employee exposures to n

oise. In addition,

Acme Manufacturing Co. has requested that, while on site, you conduct a needs analysis to

determine the development of a new safety training program, exhibiting training and

management techniques. Explain your methodology and the steps i

n conducting this needs

analysis. After conducting a field assessment, prepare a written report for Bob Sanders (CSP) to

present to the Board of Directors. During your field investigation, you find the following field

observations:

 

 

Machine Shop #1

 

 

 

The

company has an on

–

site maintenance and repair facility. Inside Machine Shop #1, there are

five employees that operate a variety of machines, ranging from stationary and portable grinders,

drill presses, and metal shearers. Based on the information provided

 

in the following table,

determine the individual employee’s exposure: (DO NOT COMBINE NOISE LEVELS)

 

Location

 

Employee

 

Sample

#1

 

Sample

Time #1

 

Sample

#2

 

Sample

Time #2

 

Sample

#3

 

Sample

Time #3

 

Stationary

Grinding

Wheel

 

Robert

Jones

 

82 dBA

 

90 min

 

91 dBA

 

125 min

 

83 dBA

 

265 min

 

Drill Press #4

 

Clara

Tucker

 

89 dBA

 

135 min

 

79 dBA

 

249 min

 

81 dBA

 

96 min

 

Metal Shear

#2

 

Rick

Starnes

 

75 dBA

 

283 min

 

94 dBA

 

39 min

 

84 dBA

 

158 min

 

Metal Shear

#3

 

Jennie

Gump

 

83 dBA

 

114 min

 

73 dBA

 

239 min

 

95 dBA

 

127 min

 

Bench Press

#7

 

Bernie

Edwards

 

73 dBA

 

203 min

 

79 dBA

 

172 min

 

83 dBA

 

105 min

 

 

 

Carpentry Shop #2

 

 

 

Inside Carpentry Shop #2, there are six machines operating almost continuously, including table

saws, planers, exhaust systems, jointers, with 10 employees working in this area. To determine

whether this table should be designated as a hazardous noise envi

ronment, thus requiring

UNIT IV PROJECT OSH4308

Instructions

Hazardous Noises Report

 

After receiving good remarks from your previous work, you hear that Acme Manufacturing Co.

has asked you and BSCI to return for some additional work. BSCI has been contracted by Acme

Manufacturing Co. to conduct a study to determine employee exposures to noise. In addition,

Acme Manufacturing Co. has requested that, while on site, you conduct a needs analysis to

determine the development of a new safety training program, exhibiting training and

management techniques. Explain your methodology and the steps in conducting this needs

analysis. After conducting a field assessment, prepare a written report for Bob Sanders (CSP) to

present to the Board of Directors. During your field investigation, you find the following field

observations:

 

Machine Shop #1

 

The company has an on-site maintenance and repair facility. Inside Machine Shop #1, there are

five employees that operate a variety of machines, ranging from stationary and portable grinders,

drill presses, and metal shearers. Based on the information provided in the following table,

determine the individual employee’s exposure: (DO NOT COMBINE NOISE LEVELS)

Location Employee

Sample

#1

Sample

Time #1

Sample

#2

Sample

Time #2

Sample

#3

Sample

Time #3

Stationary

Grinding

Wheel

Robert

Jones

82 dBA 90 min 91 dBA 125 min 83 dBA 265 min

Drill Press #4

Clara

Tucker

89 dBA 135 min 79 dBA 249 min 81 dBA 96 min

Metal Shear

#2

Rick

Starnes

75 dBA 283 min 94 dBA 39 min 84 dBA 158 min

Metal Shear

#3

Jennie

Gump

83 dBA 114 min 73 dBA 239 min 95 dBA 127 min

Bench Press

#7

Bernie

Edwards

73 dBA 203 min 79 dBA 172 min 83 dBA 105 min

 

 

Carpentry Shop #2

 

Inside Carpentry Shop #2, there are six machines operating almost continuously, including table

saws, planers, exhaust systems, jointers, with 10 employees working in this area. To determine

whether this table should be designated as a hazardous noise environment, thus requiring

Needs help with similar assignment?

We are available 24x7 to deliver the best services and assignment ready within 3-4 hours? Order a custom-written, plagiarism-free paper

Get Answer Over WhatsApp Order Paper Now

https://getspsshelp.com/wp-content/uploads/2024/12/logo-8.webp 0 0 Besttutor https://getspsshelp.com/wp-content/uploads/2024/12/logo-8.webp Besttutor2025-09-18 04:50:132025-09-18 04:50:13UNIT IV PROJECT

How It Works


1. Submit Your SPSS Assignment
Provide all the details of your SPSS assignment, including specific instructions, data requirements, and deadlines. You can also upload any relevant files for reference.
2. Get a Quote
Once we receive your details, we’ll assess your assignment and provide you with an affordable quote based on the complexity and urgency of the task.
3. Receive Expert SPSS Assistance
Our SPSS specialists will begin working on your assignment, delivering high-quality, accurate solutions tailored to your needs. We ensure all calculations and analyses are precise.
4. Review and Finalize
Once your SPSS assignment is completed, review the work. If it meets your expectations, approve and download it. If you need revisions, simply request a revision, and we will make the necessary changes.
Order Your SPSS Assignment Now

About us

At Get SPSS Help, we provide expert assistance with SPSS and data analysis tools. Our team delivers accurate, timely, and affordable solutions for academic and professional assignments with

Quick links

  • Home
  • About Us
  • How it works
  • Services
  • Why Us
  • Blog

We Accept

Contact us

Email:
support@getspsshelp.com

Phone:
+1 (317) 923-9733

© Copyright 2025 getspsshelp.com
  • Refund Policy
  • Terms and Conditions
Read Field to Fork’s ch1 How important is corporate philosophy to a company’s pollution prevention...
Scroll to top
WhatsApp
Hello 👋
Can we help you?
Open chat